Timescales and project duration were one of the key factors in managing the contract works as the works were so extensive, the office had to be vacated. The team at Business Designs pulled “all stops” and entire physical works were completed in less than one month.
We designed and planned the new interior including mood boards, sample furniture and interior finishes.
Upon commencement on site, we demolished most of the interior partitions and ceilings and we then set about drylining the interior walls including tape, jointing and decoration.
A new 600mm x 600mm suspended ceiling was installed along with new LED lighting. We extended and upgraded the client’s data cabling and power installation to suit the new layout including installation of new patch panels and a data cabinet.